Posts

Week 6

My teammates have made some good progress.  While I designed the racking structure, Tan worked on the gutter helmet design, while Charles worked on the wind-loading analysis.  There is currently a small amount of confusion with regards to producing shop drawings.  As far as my own knowledge, there are two sets of shop drawings that need to be produced: the shop drawings for fabrication that are going to be sent out to companies, such as Vander-Bend, and the shop drawings that are going to be sent to Futran for further evaluation.  The solar team is not currently planning on hiring help with regards to fabrication.  Other teams, such as the track team, are using outside vendors to help with fabrication processes, and require detailed shop drawings to do so.  I have personally never had to produce a detailed shop drawing, so this should be an interesting learning experience.

Week 5

I think we finally have it! Dr. Furman sent out an email a few days ago, detailing what he believes to be the most optimized design.  Using Solidworks, I made a design that very much matches his requirements in his drawing. If he has time today, I will show him my design, and he will hopefully approve it.

Week 4

The team has been making more design changes and has been preparing for the first presentation of the semester.  I have been personally making most of the design changes, as it is getting more and more difficult to trust some of my group mates with different tasks.  The overall racking structure is almost complete, the team just needs to worry about the gutter helmet fitting.

2nd Semester, Week 3

Image
The team has made yet another design that features a canopy and a middle trussing component.  The solar team believes that this design will be optimal due to the fact that wind loading will be decreased due to the gaps in the design.  However, the current design is still undergoing changes. 

2nd Semester, Week 2

There has been more design iterations that I have been working on for the team.  The current design was made to be compatible with up to 8 solar panels that can either 1m x 2m or 1m x 1.66m.  Dr. Furman suggested implementing a truss design to ensure the stability and strength of the design.  The team is currently scrambling to get designs approved in order to begin ordering parts and planning the scope of work.

2nd Semester, Week 1

There has been some ongoing discussions on the possibility of changing the proposed 9 meter section of track to 3 meters to save on material costs.  Currently, the proposed combined budget of the full scale solar, bogey, and track teams is north of ten thousand dollars.  If this proposed change is agreed to, the solar team have the unique challenge of implementing standardized solar panel sizes of 1 m x 2 m or 1 m x 1.6 m to a track that is approximately 3 meters in length.  The solar team is currently reworking designs for implementation.

Week 10

Image
I have been spending a whole lot of time in the past week using Solidworks to make a good model of the truss design.  I'm personally not too experienced with Solidworks, so a bunch of my time has been spent trying to learn the software.  Below is a simple sketch that I made of our base truss design.  I'm currently in the process of making all of the different linkages that will go into the final assembly.  I'm trying to leave spaces in the open gaps of the truss for our solar panels, but right now I'm a little confused on some of the dimensions of the available panels that we have to work with.  I'm going to take all the dimensions of the available solar panels again, as soon as I get back into the shop.