Week 8

The full-scale track, bogey, and solar teams will now have regular meetings where progress is discussed in a group setting.  Details involving the track and certain design elements were discussed in the previous team meeting.  The 9 meter track will consist of two "L" beams to support the straight section, and one "T" beam to support the switch, as seen in the figure below.  The solar team has decided to implement a truss design to support the racking of the solar panels.  The truss will support a "shell" that will be configured with the needed solar panels.  The figure below does show the truss design, but not the shell, as the team is still in the process of designing that specific part.

Comments

Popular posts from this blog

Week 7

Week 13

Week 9