2nd Semester, Week 2

There has been more design iterations that I have been working on for the team.  The current design was made to be compatible with up to 8 solar panels that can either 1m x 2m or 1m x 1.66m.  Dr. Furman suggested implementing a truss design to ensure the stability and strength of the design.  The team is currently scrambling to get designs approved in order to begin ordering parts and planning the scope of work.